Department: General Services
Subject: Type of Action: Approval/Action
title
Resolution authorizing the Mayor to execute Change Order No. 2 between the City of Huntsville and Garber Construction Company, Inc. for construction services for the Huntsville Aquatic Center Phase 4.
Resolution No.
body
Finance Information:
Account Number: 4013-14-00000-523040-00000000-
City Cost Amount: $41,677.31
Total Cost: $6,565,410.43
Special Circumstances:
Grant Funded: NONE
Grant Title - CFDA or granting Agency: N/A
Resolution #: N/A
Location: (list below)
Address: 2213 Drake Avenue SW
District: District 1 ☐ District 2 ☐ District 3 ☐ District 4 ☒ District 5 ☐
Additional Comments: Change Order No. 2 to include the following: Roof flashing; electrical outlets, blocking allowance, epoxy floor change; sewer work; concrete and rebar allowance; painting, floor patch, additional conduits; misc. electrical for Inspection; hose bib water line repairs; credit for Patchrete; timing system boxes and louver frames; pump room enclosure; irrigation repairs; pool equipment repairs; aluminum allowance; structural steel allowance; and pool filter repair.