File #: 2024-1664   
Type: New Business for Consideration or Action Status: Passed
File created: 7/11/2024 In control: City Council Regular Meeting
On agenda: 7/25/2024 Final action: 7/25/2024
Title: Resolution authorizing the Mayor to execute Change Order No. 1 between the City of Huntsville and Garber Construction Company, Inc. for the Huntsville Aquatic Center Phase 4. Resolution No.
Sponsors: General Services
Attachments: 1. COMPLETE-Garber CO1-HsvAquaticPH4.pdf

Department:  General Services

Subject:                                                                                                                                                Type of Action:   Approval/Action                 

title
Resolution authorizing the Mayor to execute Change Order No. 1 between the City of Huntsville and Garber Construction Company, Inc. for the Huntsville Aquatic Center Phase 4.

 

Resolution No. 

 

 

 

 

 

 

body

Finance Information:

 

Account Number: 4013-14-00000-523040-00000000

City Cost Amount: $59,402.48

Total Cost: $ 6,523,402.48

Special Circumstances:

 

Grant Funded: NONE

Grant Title - CFDA or granting Agency: N/A

Resolution #: N/A

 

Location: (list below)

 

Address:  2213 Drake Avenue

District:  District 1      District 2       District 3       District 4      District 5 

 

Additional Comments:  

Change Order No. 1 to include: Add timing conduit; credit for reduction of gusset plates, sleeves and welding; remove existing beam over siding doors and replace with aluminum tube, delete aluminum plates, move electrical as needed, move sprinkler; removal of existing misc. hardware from walls and columns; weatherize two-way loudspeaker with Mount, all necessary hardware required; furnish and install two aluminum frames at exhaust ducts; replace galvanized chain link fence guard rail with aluminum vertical picket style guard rail; cap existing fire sprinkler inside Legacy Pool area; provide and install missing roof panel motor cover and motor mount; remove damaged concrete from vent locations; prep rebar, form and patch; lane rope mounts, install 65 new lane rope mounts on pool gutter; provide and install plates on masonry walls for the Kalwell system; provide and install structural members for new scoreboard; replace storefront doors and frames between Meet Management and Pool area.