Department: General Services
Subject: Type of Action: Approval/Action
title
Resolution authorizing the Mayor to execute Change Order No. 4 to the Fixed Price Agreement between the City of Huntsville and Lee Builders, Inc. for the Joe Davis Stadium Renovation.
Resolution No.
body
Finance Information:
Account Number: 3020-14-00000-523021-00000000
City Cost Amount: $ 350,704.29
Total Cost: $ 29,215,251.47
Special Circumstances:
Grant Funded: No
Grant Title - CFDA or granting Agency: N/A
Resolution #: N/A
Location: (list below)
Address: 3125 Leeman Ferry Road
District: District 1 ? District 2 ? District 3 ? District 4 ? District 5 ?
Additional Comments:
Change Order No. 4 to include: Install owner furnished structural soil; close up hole in upper concrete slab; add and modify steel at area 2; added beams, fabrication, erection; install concrete caps on ends of vomitories; restroom renovations; concrete and colored pigment price increase; cast stone column caps; Demo 8 steps and replace 10 steps; expedite original NEMA3 switch gear panel; additional framing and clips at Area 4 & 5; add grills at Terrace Bar; addition of 2 x 12 engraved planked seating; addition of footing, CMU, concrete cap at Area 2; credit for typographical error on Change Order 3; added concrete to southside of concourse; added water lines to existing restrooms, repaired water lines and patched walls; add 26 concrete steps at end of seating sections 201,202,203,204, (Area 5); dehumidifiers for installation of finishes due to delayed switch gear; change floor sinks in upper level bar to ones with flanges; heat detectors/monitors, heat trace at elevator, conduit/cabling WAP adds; epoxy flake flooring at existing restroom vestibules; paint PVC piping under stadium seating, plumbing covers, conduit on columns thicken concrete additional 2 for lift access; add FRP at Upper Area 4- men's 244 and women's 243; addition of s...